Outsourcing – A Very Real Strategic Planning Option

Within the current recessionary business climate andthe Replenishment Lead Time and supply the client
within the Strategic Planning process, there may be awith a delivery lead time that is attainable and
strong Business Case to outsource one of theacceptable to the client.
Functional Areas of a company. Outsourcing is often- A rolling 6 month forecast is a requirement to provide
made in the interest of making better use of capital,supply chain a view into the mix and number of SKUs
infrastructure, technology and current capacity ratherthat will be required as a forward look into the
than an expanded investment in brick and mortar.business.
Outsourcing can also be a downsizing strategy.- Without a forecast, lead-times and inventory
The services that are commonly outsourced can bebecomes an Achilles heel to the manufacturing
Information Technology, Human Resources, Facilitiesprocess.
Management/Real Estate, Accounting, Design 
Engineering, Manufacturing, Test, Forward andManufacturing
Reverse Logistics, to name but a few.- Now the ‘build something’ begins with the
The purpose of this article on Outsourcing is to deal ofpreparation of the manufacturing process and profiles
the role of Product Management and the transfer ofneed to be developed.
the management of a product, product group or an- This will/can include any equipment programs and
entire product portfolio to a selected service provider.profiles for the SMT equipment, any special tools and
An outsourcing arrangement is in the form of a twoor fixtures that will be required for assembly.
party Manufacturing Service Agreement (MSA) that- Manufacturing assembly instructions need to be
describes the services to be provided and the metricscreated and details into people and tools and jigs that
that will be used to measure the performance of themay be required.
service provider for the term of the contract, usually- This aspect needs to be done in advance of the first
one year and auto renewable.build so as the process can start immediately.
To illustrate, the following steps will use will deal with 
outsourcing of electronic component manufacturing,Test
specifically the transfer of a product to a low cost- All product that is manufactured needs to have an
geography or to an alternate or the addition of aend to end strategy as to how it will be tested to
second supplier.insure quality product is manufactured in a repeatable
The fundamental building blocks of a successfulprocess.
outsource transfer is the process and the integrity of- Test processes, equipment, and test equipment
the information given from one company to another.manuals must be in place and the latest rev of the
The seven key attributes or ‘critical successtests being performed must be signed off by the
factors’ of this type of well orchestrated Productservice provider and the client.
Management outsourcing arrangement can be broken- This aspect of the process is one that requires some
down as follows:  extra care and review to insure that the procedures
 and equipment are ready when the manufacturing
Documentationprocess transfer takes place.
- Documentation will be the foundation of the process 
and attention to details is paramount at this stage.Logistics
- The information needs to be complete and accurate.- Now product is ready for shipment and the start of
- Drawings need to be of the latest revision and mustrevenue generation.
include any ECO or planned ECO.- To do so the information on frequency of shipments,
- The bills of materials must have complete partdaily, weekly, monthly for example must be in place.
numbers, supplier’s names and it is always helpful if- Any international shipment requirements that include
there are multiple sources.duties or tariffs or any licenses need to be completed
- The master data must be created by the serviceand in place.
provider and therefore both the drawings and the bills 
of materials must be reviewed and the revision levelInfrastructure
agreed to by both the service provider and the- Infrastructure is of course the all encompassing
outsourcing company to insure the product isfront-to-back aspect of the process.
manufactured to the latest revision.- Before any decisions get made does the service
 provide have the infrastructure required to
Supply Chainmanufacture the product.
- Inventory, a necessity to a successful manufacturing- Are there clean room or special handling
plan but, lack of inventory can be disastrous.requirements for optical or leading edge technology
-  The client will need to provide sourcing informationproducts? What kind of power requirements is
as to the percentage of the products will be comingneeded?
form North American suppliers and also the- The IT and network structure must be available
percentage of suppliers from Asia and other parts ofwhen and where it is r
the globe.- Does the product have any security that needs to
- Contracts that exist need to be shared and letters ofbe created and put in place?
authorizations need to be provided to the service- required.
provider so as the suppliers will honour any existing pre 
negotiated contract pricing.In conclusion, outsourcing to a service provider is a
- Existing inventory needs to be reconciled andcommon practice and has been a longstanding key
prepared for shipment to the service provider so as toattribute of fortune 500 companies as well as start
minimize any duplicate purchases.ups and everyone in between for decades.  It is
 something that with an interactive, robust outsourcing
Planningprocess with a good client project teams both the
- Demand signals and the frequency of there receiptclient and the service provider will have a long lasting
must be adhered to so the planning group can definerelationship with benefits to both companies.